CT Jobs refer to well workover operations involving coiled tubing reeled on special units. Essentially, coiled tubing allows state-of-the-art well workover, and its application ensures highest level of operational and environmental safety during operations.
In 2014, FJV was chosen the winner of an award from Intervention & Coiled Tubing Association (ICoTA) - «Best Company in the Sphere of CT Technologies Application in Russia and CIS»
Max. pulling capacity – 80К lbs. (36 tons)
Tubing OD 1 ¾”
Reel capacity - 17,060 ft. (5,200 m), including CT with wireline.
Max. pulling capacity – 59.5К lbs. (27 tons)
Tubing OD 1 ¾”
Reel capacity - 22,310 ft. (6,800 m), including CT with wireline.
Max. flow rate 79.25 gpm (0.3 m3/min) @ 10,150 psi (70 MPa).
Nitrogen Cryogenic Units with max. flow rate of gaseous nitrogen – 1,850 – 22,450 gpm @ 10,150 psi (70 MPa).