By continuing to use the site, you agree to our use of cookies.
AGREE
Established in 2020, the Well Stimulation and Testing Department focuses on these operations, as well as fluid degassing with subsequent injection of fluid into the reservoir. All modular separation and filling units were manufactured in 2020 to 2022 to FJV engineering drawings.

WELL STIMULATION AND TESTING

CAPACITY
H2S-resistant, with the capacity of up to 350 m3/day (2,200 bbl/d) and outlet pressure of up to 6.3 MPa (900 psi)
CENTRIFUGAL PUMPS
4 SEPARATION UNITS
with the capacity of up to 600 m3/day (3,800 bbl/d) for liquids and up to 1,000,000 m3/day (35 MMSCFD) for gas
OTHER ACTIVITIES
Research and Development
WELL SERVICING AND WORKOVER
SUPPORT SERVICES
COILED TUBING
OIL AND GAS WELL DRILLING
HYDRALIC FRACTURING